Areas of Expertise

Owner

University of Florida
Gainesville, Florida

Additional Details

Project Size 11,700 SF
Project Cost $1,490,000
MEP Cost $1,370,000
Delivery Method Hard Bid
Completion September 2011

UF Walker Chiller Plant Optimization

Walker Chiller Plant at the University of Florida was originally built in 1977 and has a current cooling capacity of 5,000 tons. The plant is configured in a decoupled primary-secondary piping arrangement and has four water-cooled centrifugal chillers ranging from 750 to 2,000 tons of cooling capacity.

Moses Engineering was contracted to document and analyze the existing conditions and operation of the central chiller plant. A Plant Master Plan was first submitted to the Owner, detailing existing conditions with recommendations along with a 10-year outlook. Then, plant improvement and optimization projects were compared, designed and implemented based on maintenance requirements, budget constraints and energy savings. The plant’s controls system was modified and upgraded to provide accurate energy metering and to enable full automatic operation. Finally, the owner received a full System Manual which included operation and maintenance documentation and as-built drawings of the plant.

The project had few challenges due to the close involvement of owner and maintenance personnel throughout the design and construction process.

LEED 2016 PLATINUM    FB f Logo blue 57   AHCA Florida

FCGB Certified Commision BICSI